Capacity: 187 MWp
Country: Germany
Year: 2020

Capacity: 187 MWp
Country: Germany
Year: 2020
Installed products

Mounting systems for solar parks and PV carports. Economically planned, designed to last and reliably implemented.

Steel structures for ground-mounted photovoltaic systems, from planning to delivery, all from a single source. Cost-effective, durable and of maximum quality.

Found inspiration?
If you have any questions or need further information, your contact person from the department will be happy to assist you. Solar Systems.
Suitable for the project
In the Balluff multi-storey parking lot, a circumferential façade cladding with grid elements was implemented, which clearly structures the building and gives it an open appearance.
In the Institute of Science & Technology Austria project, a grating forms a clear boundary along the glass façade as a circumferential line.
At Gestüt Garnreiter, the focus is on safety, peace and quiet and functionality in everyday stable life. Sophisticated technical solutions are used to reliably support the daily handling of the horses.
In the Saarbahn GmbH workshop in Saarbrücken, walkable running and work platforms with grating were installed along the maintenance tracks.
At the Steigerwald treetop walk in Ebrach, gratings act as walk-on viewing windows to complement the path and recreation area and provide a view downwards.
At the Munich secondary school, an open roof was installed in front of the building as weather protection using GRP gratings.
Auf einer Fläche von rund 7,3 Hektar erzeugt der Solarpark Lübars mit 7,9 MWp Gesamtleistung jährlich grünen Strom für etwa 2.439 Haushalte.
At Art Deko Aviation, large, resilient floor surfaces for the operation and handling of aircraft were implemented in an aircraft hangar.
On the Grevenkop phase shifter, large, accessible maintenance areas were implemented to ensure safe access to service points on the system.
In the saarlouis district, the Diefflen-Nalbach solar park utilizes suitable open spaces for the sustainable and climate-friendly generation of solar power.
At Tiger & Turtle, MEISER gratings make the curved circular path with steps a safe area for visitors to walk on.
Reliability and precision are crucial when it comes to a secure connection between the terminal and the aircraft. Sliding hardware plays a key role here: it enables controlled movement sequences and ensures smooth operation - even under heavy daily use.
Reliable technology shows its strength especially in daily use. Durable, functional solutions that combine comfort and stability are crucial.
Covering an area of about 15 hectares, the Gammertingen Solar Park, with a total capacity of 18.5 MWp, generates climate-friendly electricity for approximately 5,000 households.
At Heinsfeld Castle Museum, full gratings were integrated into the historic wall situation as walk-on flooring in front of the arched openings.
Our Vario-Guard stands for reliable protection and flexible use in a wide range of applications. MEISER also contributes to the implementation of sophisticated protection systems in international projects with high-quality components.
With 17,280 solar modules and a total capacity of 9.5 MWp, the Benningen Solar Park in the Allgäu region (Germany) generates approximately 11,000 MWh of green electricity annually for about 3,000 households.
Auf einer Gesamtfläche, die etwa dem 1,6-Fachen der Münchner Theresienwiese entspricht, wurden mehr als 165.000 Solarmodule installiert.
Every second counts in an emergency - especially when equipment needs to be ready to hand quickly and reliably. Functional systems in the fire department make a decisive contribution to the efficient organization of processes in an emergency.
Part of a hybrid project that integrates solar and wind energy through a shared grid infrastructure.
In the Car Park System Düsseldorf, maintenance walkways were implemented as a continuous, accessible area within the facility.
At the Adorf observation tower, staircases and platforms were implemented over several levels with accessible grating surfaces and secured landings.
At the Franz Marc Museum, walkable covering and path surfaces were realized with GRP gratings in the outdoor area.
In the Kaufbeuren pedestrian zone, a grating was integrated into a seating and recreation area as a flush cover and drainage surface.
In the Egyptian Museum in Munich, grid elements were integrated into the ceiling as linear bands and structure the space along the access route.
At the Taunus Tower in Frankfurt am Main, open maintenance areas support the safe operation of the technical roof equipment.
The plant is located near Aarhus (Denmark) and, with a capacity of approximately 135 MWp, covers an area roughly the size of 175 soccer fields.
At Howald station in Luxembourg, steps with anti-slip treads were installed to ensure a safe route.
Robust pile solutions for challenging steep slopes at the Kriechel vineyard in the Ahr valley.
In the Poststadion Berlin, grandstand areas were equipped with anti-slip tread and walking zones for safe paths between the rows of seats.
A photovoltaic plant with a total capacity of approximately 60 MWp was built on an area of over 55 hectares; it efficiently converts solar energy into climate-friendly electricity.
At the Potsdam Technology Center, stairs and access areas in the outdoor area were covered with grating for safe paths.
Located on land previously used for agriculture, the Lendershausen solar park, with a total capacity of approximately 7.4 MWp, generates about 7,900 MWh of green electricity annually.
Spanning approximately 16 hectares, the Seubersdorf-Batzhausen solar park generates climate-friendly electricity with a total capacity of 15 MWp and 27,621 solar modules.
meiser supplies custom-designed vehicle restraint systems for one of the automotive industry's most renowned test tracks worldwide.
Accessible walkways with GRP gratings were installed along the tracks of the Dresden funicular for maintenance and operation.
At the testing and technology center south of Madrid, a vehicle restraint system from meiser ensures the reliable safety of a high-speed test track.
Spanning approximately 965,000 m², the Borrentin Solar Park generates climate-friendly electricity with a total capacity of 114.6 MWp and just under 200,000 PV modules.
At Cents-Hamm station in Luxembourg, anti-slip tread pads were installed on a staircase to ensure a safe route.
At the Conerus School in Norden, open access areas support the safe operation of the external staircase on the building.
At the Irchenrieth curative education center, open steps and platforms divide the entrance and lead along the façade as a narrow outdoor walkway.
At the viewing platform on the Ochsenlacke in St. Jakob in Defereggen, a walk-on grating is used as a walking and resting surface.
At the furniture store in Paderborn, an external escape and maintenance walkway with accessible grating decking and railings was installed.
At the pilot pier in Brunsbüttel harbor, gratings are used as walkway decking and railing infill for safe paths down to the water's edge.
At the Bundeskunsthalle Bonn, walk-on surfaces with fine-mesh grating were installed in the outdoor area.
For the "Vanda" seating set from Runge, gratings were used as robust seating and table surfaces for outdoor use.
At the day care center in Baden-Baden, external access areas were implemented with lattice elements as railing infill and walk-on flooring.
At the Birkenmeier green wall in Breisach, louvre grids were used as façade cladding for the modular greening.
In the Volkswerft project, GRP systems were implemented as accessible work and maintenance areas in a waste water tank.
At Carl Spaeter, work areas on an automated system were equipped with walk-on and usable metal supports in the production environment.
MEISER supplied the vehicle restraint systems to secure various test modules for the AVL ZalaZONE test track in Hungary. The project is one of the most modern development and testing centers for vehicle and mobility technologies in Europe.
MEISER supplied Vario-Guard MUF systems including specially developed transition solutions for the widening of the E40 near Borås in Sweden. The project was implemented in collaboration with the construction company PEAB.