The walking level is integrated at the upper edge of the building and runs as a continuous zone along the technical areas in the interior.
Smooth sheet metal gratings were used for the flooring and walkways. A total of 227 m² of smooth sheet metal was installed and used as maintenance and access areas. This creates clear walking zones that support safe access during hall operation.