Skip to content

Waldschlösschen Bridge Dresden

Inspiration & Projekte: Waldschlösschen Bridge Dresden

The accessible areas are integrated along the bridge components on the outside.

Gratings were installed in the heavy-duty grating version with a mesh width of 50 x 50 mm and bearing bar 150 x 5 mm as well as additional grating steps in the form of press-welded grating steps with a mesh width of 34 x 38 mm and bearing bar 30 x 3 mm and press-locked grating steps with a mesh width of 33 x 33 mm and bearing bar 60 x 3 mm. The open grating surfaces form safe tread zones and allow access for inspection and maintenance along the structure. This creates continuous walking and tread areas for bridges, floor coverings and walkways.

Verbaute Produkte

Unsere Lösungen im Einsatz

Unsere Lösungen im Einsatz – Grating Solutions

Grating Solutions

Durable industrial flooring made of steel and fiberglass-reinforced plastic (FRP): grating, profiled sheet metal grating, and innovative accessible solutions designed for safety, functionality, and durability.

Meiser Holding GmbH – Heavy-Duty Gratings
Meiser Holding GmbH – Heavy-Duty Gratings

Heavy-Duty Gratings

MEISER heavy-duty gratings are specifically engineered for applications involving exceptionally high loads. They are manufactured as press-locked gratings with extra-high and/or extra-wide bearing bars, complemented by correspondingly dimensioned filler bars.

Meiser Holding GmbH – Gratings
Meiser Holding GmbH – Gratings

Gratings

Gratings are used as robust platform and walkway coverings in heavy industry, architecture, plant construction and logistics.

Meiser Holding GmbH – Grating Solutions
Ansprechpartner

Ansprechpartner

Inspiration gefunden?
Bei Fragen und weiterem Informationsbedarf unterstützt Sie gerne Ihr Ansprechpartner aus dem Bereich Grating Solutions.

Passend zum Projekt

Weitere Referenzen

Zu allen Referenzen
MEISER: Administration Stahlwerke Bremen
MEISER - Administration Stahlwerke Bremen

Administration Stahlwerke Bremen

Lattice elements were integrated into the glass façade of the Stahlwerke Bremen administration building as visible façade and construction elements.

MEISER: Dresden city cable car
MEISER - Dresden city cable car

Dresden city cable car

Accessible walkways with GRP gratings were installed along the tracks of the Dresden funicular for maintenance and operation.

MEISER: Main bridge Haßloch
MEISER - Main bridge Haßloch

Main bridge Haßloch

At the Mainbrücke Haßloch bridge, open maintenance and access areas support safe operation along the track system in the outdoor area.

MEISER: Middle school Munich
MEISER - Middle school Munich

Middle school Munich

At the Munich secondary school, an open roof was installed in front of the building as weather protection using GRP gratings.

MEISER: Franz Marc Museum
MEISER - Franz Marc Museum

Franz Marc Museum

At the Franz Marc Museum, walkable covering and path surfaces were realized with GRP gratings in the outdoor area.

MEISER: Office building Cologne
MEISER - Office building Cologne

Office building Cologne

On the office building in Cologne, façade elements were implemented as an upstream grid structure to functionally complement window areas and structure the design.

MEISER: Ammersee-Gymnasium Dießen
MEISER - Ammersee-Gymnasium Dießen

Ammersee-Gymnasium Dießen

At Ammersee-Gymnasium in Dießen, outdoor areas and steel construction elements were finished with grating to give paths and façade areas a clear structure.

MEISER: Workshop Saarbahn GmbH Saarbrücken
MEISER - Workshop Saarbahn GmbH Saarbrücken

Workshop Saarbahn GmbH Saarbrücken

In the workshop hall of Saarbahn GmbH in Saarbrücken, accessible walking and working platforms with grating coverings were installed along the maintenance tracks.

MEISER: OneonOne House Luxembourg
MEISER - OneonOne House Luxembourg

OneonOne House Luxembourg

At OneonOne House in Luxembourg, open façade surfaces support safe operation and structure the projecting levels on the building envelope.

MEISER: Rheinau jetty
MEISER - Rheinau jetty

Rheinau jetty

At the Rheinau jetty, walkable dock areas along the berths are being fitted with MEISER GRP gratings as walkways.

MEISER: CTLES Paris
MEISER - CTLES Paris

CTLES Paris

At CTLES Paris, open walkways and maintenance areas support safe operation in the technical interior areas between the archive modules.

MEISER: Hegau Tower Hotel
MEISER - Hegau Tower Hotel

Hegau Tower Hotel

In the Hegau Tower Hotel, pressed gratings were used as walk-on flooring in the maintenance area on the roof.

MEISER: Stralsund Oceanarium
MEISER - Stralsund Oceanarium

Stralsund Oceanarium

In the Ozeaneum Stralsund, pressed gratings were used as railing fillings to clearly define the ramp layout in the interior.

MEISER: Parking garage Bietigheim-Bissingen
MEISER - Parking garage Bietigheim-Bissingen

Parking garage Bietigheim-Bissingen

The access core of the parking garage in Bietigheim-Bissingen was designed with a permeable grid cladding that clearly accentuates the façade.

MEISER: Eccentric house Bochum
MEISER - Eccentric house Bochum

Eccentric house Bochum

At the Exzenterhaus Bochum, full gratings were used as walk-on surfaces and blend in with the surrounding design of the building envelope.

MEISER: Egyptian Museum Munich
MEISER - Egyptian Museum Munich

Egyptian Museum Munich

In the Egyptian Museum in Munich, grid elements were integrated into the ceiling as linear bands and structure the space along the access route.

MEISER: BMW parking garage Paris Velizy
MEISER - BMW parking garage Paris Velizy

BMW parking garage Paris Velizy

In the BMW parking garage Paris Vélizy, a circumferential MEISER grating façade forms the permeable outer skin of the parking levels.

MEISER: Silicon Products Group
MEISER - Silicon Products Group

Silicon Products Group

At Silicon Products Group, maintenance platforms and walkways in the industrial plant were equipped with walk-on grating surfaces.

MEISER: Rügen Bridge Stralsund
MEISER - Rügen Bridge Stralsund

Rügen Bridge Stralsund

In the Rügen Bridge in Stralsund, a continuous maintenance walkway was implemented in the interior of the structure with accessible grating surfaces.

MEISER: German Hygiene Museum
MEISER - German Hygiene Museum

German Hygiene Museum

In the Deutsches Hygiene-Museum, grid elements were integrated as permeable ceiling cladding above the stage and structure the event hall.

MEISER: RTL Studio Berlin
MEISER - RTL Studio Berlin

RTL Studio Berlin

In the RTL Studio Berlin, open wall surfaces support safe operation in the studio and divide the area behind the grandstand.

MEISER: Pinacotheca
MEISER - Pinacotheca

Pinacotheca

In the Pinakothek in Munich, gratings support safe inspection and service work as an accessible maintenance walkway in the roof area.

MEISER: People’s shipyard
MEISER - People’s shipyard

People’s shipyard

In the Volkswerft project, GRP systems were implemented as accessible work and maintenance areas in a waste water tank.

MEISER: Office building Horw
MEISER - Office building Horw

Office building Horw

VP Venetian blind grilles were integrated into the façade design of the office building in Horw as upstream parapet and sun protection elements.

MEISER: Keolis train wash system
MEISER - Keolis train wash system

Keolis train wash system

In the Keolis train wash, continuous maintenance and walking areas along the washing line were implemented with GRP grating as flooring.

MEISER: Eli Shopping Center Liezen
MEISER - Eli Shopping Center Liezen

Eli Shopping Center Liezen

In the Eli shopping center in Liezen, open ceiling and wall surfaces structure the upper mall gallery and enclose the area above the store fronts.

MEISER: National Library of Luxembourg
MEISER - National Library of Luxembourg

National Library of Luxembourg

In the National Library in Luxembourg, solid gratings were used as partial elements of the ceiling cladding to give the interior a clear structure.

MEISER: Zollverein World Heritage Site
MEISER - Zollverein World Heritage Site

Zollverein World Heritage Site

At the Zollverein World Heritage Site, lattice elements were used as railing infills to safely enclose openings and entrances in the hall area.

MEISER: Parking garage St. Josef Regensburg
MEISER - Parking garage St. Josef Regensburg

Parking garage St. Josef Regensburg

In the St. Josef Regensburg multi-storey parking lot, VP louvre grilles characterize the building envelope as façade cladding and enclose the open parking levels.

MEISER: National Museum Doha
MEISER - National Museum Doha

National Museum Doha

In the National Museum Doha, open presentation areas divide the walking and standing zones around the exhibition vehicle.

MEISER: Stone slab Waidring
MEISER - Stone slab Waidring

Stone slab Waidring

In the Steinplatte Waidring project, gratings were used as walkable surfaces on a viewing platform on the rock.

MEISER: Losheim office building
MEISER - Losheim office building

Losheim office building

For the office building in Niederlosheim, a continuous ceiling cladding was realized throughout the entire complex and supplemented by solutions for floor areas and walkways.

MEISER: Plauen municipal swimming pool
MEISER - Plauen municipal swimming pool

Plauen municipal swimming pool

In the Plauen municipal swimming pool, pressed gratings were used as partial elements of the ceiling cladding and characterize the design of the indoor swimming pool.

MEISER: Treetop Walk Steigerwald Ebrach
MEISER - Treetop Walk Steigerwald Ebrach

Treetop Walk Steigerwald Ebrach

At the Steigerwald treetop walk in Ebrach, gratings act as walk-on viewing windows to complement the path and recreation area and provide a view downwards.

MEISER: Elbphilarmonie Hamburg
MEISER - Elbphilarmonie Hamburg

Elbphilarmonie Hamburg

At the Elbphilharmonie concert hall in Hamburg, open maintenance areas create clear walking zones in the roof area around the technical equipment.

MEISER: Porsche Center Lübeck
MEISER - Porsche Center Lübeck

Porsche Center Lübeck

At the Porsche Center Lübeck, narrow grating strips were integrated into the interior as clear lines both in the floor area and as a ceiling solution.

MEISER: Grindelwald First
MEISER - Grindelwald First

Grindelwald First

For the "First View" viewing platform on Grindelwald First, load-bearing and accessible surfaces were integrated into the striking steel structure at an altitude of around 2,200 meters.

MEISER: Technology Center Potsdam
MEISER - Technology Center Potsdam

Technology Center Potsdam

At the Potsdam Technology Center, stairs and access areas in the outdoor area were covered with grating for safe paths.

MEISER: De Walvis Amsterdam
MEISER - De Walvis Amsterdam

De Walvis Amsterdam

In the De Walvis project in Amsterdam, façade and ceiling areas were implemented with lattice elements that characterize the architecture and incorporate the outdoor areas.

MEISER: Jade Weserport Wilhelmshaven consortium
MEISER - Jade Weserport Wilhelmshaven consortium

Jade Weserport Wilhelmshaven consortium

In the Jade Weserport joint venture project in Wilhelmshaven, maintenance walkways in the technical area were implemented with GRP gratings as accessible walking zones.

MEISER: Arvato Logistics Center
MEISER - Arvato Logistics Center

Arvato Logistics Center

In the Arvato logistics center, open wall and ceiling surfaces structure the reception area and enclose technical zones above the counter.

MEISER: Freiham geothermal power plant
MEISER - Freiham geothermal power plant

Freiham geothermal power plant

At the geothermal power plant in Freiham, maintenance and operating platforms in the technical area were equipped with walk-on grating surfaces.

MEISER: Munich sports hall
MEISER - Munich sports hall

Munich sports hall

In the Munich sports hall, open ceiling surfaces support safe operation and integrate lighting and hall technology.

MEISER: IKEA Vienna
MEISER - IKEA Vienna

IKEA Vienna

In the Ikea Vienna project, external levels and entrances were implemented on the open façade structure over several storeys.

MEISER: Moritzburg Art Museum
MEISER - Moritzburg Art Museum

Moritzburg Art Museum

In the Moritzburg Art Museum project, a recessed façade area was implemented with lattice elements to clearly accentuate the transition between the old and new buildings.

MEISER: Parking deck Marburg
MEISER - Parking deck Marburg

Parking deck Marburg

On the parking deck in Marburg, ramp areas and railing zones were designed with lattice elements that clearly structure the spiral-shaped construction.

MEISER: Ülzen sewage treatment plant
MEISER - Ülzen sewage treatment plant

Ülzen sewage treatment plant

In the Uelzen sewage treatment plant project, raised maintenance paths with GRP steps were implemented as accessible access and walking areas along the plant.

MEISER: Denios AG Bad Oeynhausen
MEISER - Denios AG Bad Oeynhausen

Denios AG Bad Oeynhausen

At Denios AG in Bad Oeynhausen, open walkways and shelving areas support safe operation in modular container systems.

MEISER: Bechtle Freiburg
MEISER - Bechtle Freiburg

Bechtle Freiburg

At the Bechtle Freiburg office building, open façade surfaces support safe operation and provide sun and privacy protection in front of the ribbon windows.

MEISER: Pedestrian zone Kaufbeuren
MEISER - Pedestrian zone Kaufbeuren

Pedestrian zone Kaufbeuren

In the Kaufbeuren pedestrian zone, a grating was integrated into a seating and recreation area as a flush cover and drainage surface.

MEISER: Heinsfeld Castle Museum
MEISER - Heinsfeld Castle Museum

Heinsfeld Castle Museum

At Heinsfeld Castle Museum, full gratings were integrated into the historic wall situation as walk-on flooring in front of the arched openings.

MEISER: Observation tower Gobelwarte Grein
MEISER - Observation tower Gobelwarte Grein

Observation tower Gobelwarte Grein

At the Gobelwarte observation tower in Grein, the platform and staircase were fitted with grating coverings for safe, accessible surfaces in the steel structure.

MEISER: Lesumhafen
MEISER - Lesumhafen

Lesumhafen

In the Lesumhafen project, MEISER GRP gratings are used as walk-on flooring on a jetty between the berths.

MEISER: Tiger & Turtle
MEISER - Tiger & Turtle

Tiger & Turtle

At Tiger & Turtle, MEISER gratings make the curved circular path with steps a safe area for visitors to walk on.

MEISER: Hanse House Oberleichtersbach
MEISER - Hanse House Oberleichtersbach

Hanse House Oberleichtersbach

At Hanse-Haus in Oberleichtersbach, gratings are used as accessible walking, working and maintenance surfaces in the hall and production area.

MEISER: Atlantic Sail City
MEISER - Atlantic Sail City

Atlantic Sail City

At Atlantic Sail City, raised outdoor platforms with walk-on floor coverings were implemented and secured by railings and balustrades.

MEISER: Van Volxem Wiltingen
MEISER - Van Volxem Wiltingen

Van Volxem Wiltingen

At Van Volxem in Wiltingen, a flush-fitted grating surface was integrated into the courtyard design as a functional cover.

MEISER: Stuttgart 21 station
MEISER - Stuttgart 21 station

Stuttgart 21 station

At Stuttgart 21 station, large, permeable surfaces support the safe operation and ventilation of the parking levels.

MEISER: Olenex Brake
MEISER - Olenex Brake

Olenex Brake

At Olenex in Brake, an accessible plant level with gratings was implemented as a walking and maintenance area for safe access to the containers.

Let's talk about whatyou have in mind,

Let's talk about whatyou have in mind,